Fits garage shelter and shed door opening widths up to 12 feet.
Dasma roll up door installation instructions.
Pull eaze roll up door kit.
Face of the door.
Delivers easy one pull access to your shelter.
Order this size so the panels will be made slightly smaller fitting perfectly in the doorway.
The stripping is.
To avoid injury keep hands and fingers clear of section joints warning track and other door parts while the door is moving.
Roll up door installation instructions and safety guidelines.
A door rolls up crooked.
Use a tape measure to carefully record the length and width of the opening.
Watch your hands and fingers using the template mark and drill 2 holes of 1 2 diameter at 2 1.
Roll up door installation guide.
Make sure all parts have been received.
Below is a list of all the parts you need to install your door.
Locate the second fusible link within 12 inches of the ceiling on the door side of the wall.
Access systems manufacturs association dasma a new safety standard for usa residential garage doors dasma 116.
Door is rolling up in a.
Roll up door installation manuals how to install steel roll up doors dbci skip to main content.
Step 1 measure the garage door opening before purchasing panels.
C edge of roll is not flush i e.
Door hard to operate in both directions.
At a home improvement store purchase some rubber weather stripping.
Fits all double zippered door fabric garages shelters and to quickly open doors using a simple pulley system.
Locate the first fusible link near the headplate s and allow for sufficient movement of the sash chain cable to release the closing mechanism s.
Do not install a link or.
At this time pre drill using a 7 32 drill.
Find installation manuals and technical information on dbci s commercial and self storage doors and products here.
B bottom rail of door rolls up out of parallel with roll of door.
Door hard to operate in one direction.
Lay the panel flat on a workbench.
Instructions on how to safely install a roll up door step 1.
The panels will be about 1 4 in 6 4 mm smaller than the opening step 2 lay weather stripping over the bottom door panel.
Be sure to use fasteners short enough not to scratch or obstruct the door.
Installation instructions series a aa roller doors page 4 installation faults and remedies faults 1.
Use the pull eaze roll up door kit to easily gain access to your shelter.
See fig 7 it is recommended to slide gutter cap ends in place and pre drill thru the cap ends and apply fasteners above door guides through the gutter end cap holes after they are installed see fig 8.